NUS Link Bridge, Singapore

Single cell box girder vehicular viaduct

Builder: Sato Kogyo (S) Pte Ltd

Engineer: T Y Lin South-East Asia Pte Ltd

Year of Completion: 2010

Special Feature:
80m long span viaduct was fully cast on the ground using long bed falseworks. The completed viaduct was then separated into smaller segments for lifting & installation on site.

Project Description:
Longest span: 80m

Construction Methodology:
Balanced cantilever segmental construction

Involvement:
- Supply & installation of Post Tensioning works
- Design, supply & operating of segment hanger
- Design & supply falseworks and formworks for PC segment production