NUS Link Bridge, Singapore
Single cell box girder vehicular viaductBuilder: Sato Kogyo (S) Pte Ltd
Engineer: T Y Lin South-East Asia Pte Ltd
Year of Completion: 2010
Special Feature:
80m long span viaduct was fully cast on the ground using long bed falseworks. The completed viaduct was then separated into smaller segments for lifting & installation on site.