Bac Hung Hai Bridge, Vietnam

 

Construction Method:
Bored pile: Earth drill method
Soft ground treatment: Vertical drain & surcharge method
Superstructure: Balanced cantilever erection method using form traveller & full staging method
Approach bridge: Full staging method

Bridge Type: 4-span continuous RC slab (approach bridge) and 5-span continuous pre-stressed box girder (main bridge)

Total Bridge Length: 370m x 2 bounds

Bridge Longest Span: 88m

Deck Width: 18.5m x 2 bounds

Year of Completion: 2014

Involvement:
General contractor: Design & construction of the whole package under EPC (Engineering, Procurement  & Construction) contract package