Construction Method:
Bored pile: Earth drill method
Soft ground treatment: Vertical drain & surcharge method
Superstructure: Balanced cantilever erection method using form traveller & full staging method
Approach bridge: Full staging method
Bridge Type: 4-span continuous RC slab (approach bridge) and 5-span continuous pre-stressed box girder (main bridge)
Total Bridge Length: 370m x 2 bounds
Bridge Longest Span: 88m
Deck Width: 18.5m x 2 bounds