Prapanca Viaduct, Indonesia
Project Description:
Segmental erection has been carried out for the total bridge length of 1.5 km with 38 nos. of T-spans, 50T to be the heaviest segment & the longest span to be 50m
Builder:
- PT ModernWidya Technical
- PT Hutama Karya (Persero)
Engineer:
PT Perentjana Djaja
Year of Completion: 2015
Involvement:
- Erection of precast box segments via balanced cantilever method using lifters
- Supply of lifters for installation of box girder segments
- Supply & installation of system formworks for stitching
- Design, fabrication, installation, commissioning & operating the lifters & formwork system
- Geometry control