Viaduct at Airport Road, Singapore

Double cell box girder vehicular viaduct

DSC_2361

Project Description:
- Total nos of span: 45
- Longest span: 45m

Construction methodology:
Span by span PC girder construction

DSC_2359a

Builder: Sato Kogyo (S) Pte Ltd

Engineer: T Y Lin South-East Asia Pte Ltd

Year of Completion: 2003

Involvement:
- Supply & installation of Post Tensioning works
- Lifting & installation of precast segments and T-shaped wing slab at both sides
- Design, supply & operating of segment erector