R8201 Sengkang & Punggol LRT, Singapore

Builder: Swee Builders Pte Ltd

Engineer: JYC Consultancy Pte Ltd

Year of Completion: on-going

Involvement:
Crossheads strengthening works via External PT-end bracket method

Special Feature: 
The steel bracket is expected to poss ability to transfer forces introduced by the post-tensioning bar to the crosshead in both directions, allow compression stress to be induced and then strengthen the crosshead

Related Projects

FIND OUT MORE ABOUT US