NUS Deep Ocean Basin, Singapore

Deep water ocean basin with workshop cum 4-storey research building

Project Description:
- 11 nos of 67m long steel roof truss; heaviest truss weighed 50 tons
- Longest sliding distance: 78m

Special Feature: 
- Two-point synchronised "pulling" method using hydraulic jacks. Difference in sliding distance between 2 pulling points were controlled to within 20mm

Builder: Lian Soon Construction Pte Ltd

Engineer: CPG Consultants Pte Ltd

Year of Completion: 2018

Involvement:
Design, supply & operation of rail sliding system & hydraulic pulling mechanism