We’re excited to share our ongoing involvement in the M-Nova project, a vibrant mixed-use development located in the heart of Kepong, Malaysia. This ambitious project features multi-storey car parks and transfer plate systems, designed to optimize space and structural efficiency.
Our role in this project encompasses the complete design, supply, and installation of post-tensioning works in key areas. We’re responsible for the multi-level car parks, outfitting each level with a durable PT floor system, along with the essential transfer plates that improve the building’s load distribution.
The PT works cover a total floor area of approximately 100,300 square meters, which includes PT car parks from Level 1 to Level 6, and PT Transfer Plates at Level 7 for Blocks A and B, and Level 1 for Block C. As M-Nova continues to take shape, we are proud to play a key role in bringing this development to life.