June 20, 2022June 20, 2022Projects, Vietnam My Thuan 2 Bridge, Vietnam My Thuan 2 Bridge begins at Km101+126, linking to the Trung Luong-My Thuan Expressway Project (An Thai Trung intersection, Cai […]
June 20, 2022Projects, Singapore The Strand Lifting Unit (SLU) Project: Integrated Business Park Development CC1, CC2 and CC3 at Punggol Digital District Description: Supplying and operating of the strand […]
September 28, 2021September 28, 2021Projects, Singapore Hup Hin Transport (HHT), Singapore EXPLORING THE OPTIMUM SLAB SYSTEM FOR 18M x 18M GRID SPAN The typical X and Y direction grids of this […]
June 28, 2020May 11, 2021Myanmar, Projects YMR Project (Phase I), Myanmar ” Pre-tensioning method in PC I-girder production is a method whereby prestressing strands are tensioned, against two rigid reaction beams […]
June 27, 2020April 13, 2021Bangladesh, Projects Dhaka MRT, Bangladesh Dhaka, a sprawling city which was the seat of various historical empires in the past, is now the sixth most […]
June 10, 2020August 31, 2020Indonesia, Projects Logos Metrolink, Indonesia Cost-Efficient The decision to change the hollow core scheme to flat slab scheme saved up to 30% of the structural […]