Dala Bridge, Myanmar
Builder: GS Engineering & Construction
Engineer:
- Soosung Engineering Co Ltd
- Dohwa Engineering Co Ltd
- Jinwoo Engineering Co Ltd
Year of Completion: 2023
Involvement:
- Erection of Precast I-Girder (each weighing 145ton; 44.9m long)
- Supply of self-launching gantry with capacity of 150tons & 55m spans
- Design & supply of formworks for approach bridge pier and pier head
About The Bridge:
The South Korea-Myanmar Friendship Bridge, also known as the Dala Bridge, is a four-lane cable stayed bridge connecting Lanmadaw and Dala townships in Yangon, Myanmar.
The Yangon Approach Side Bridge runs through the Centre of Yangon city. With the route just being a stone throw’s away from popular tourist spots such as the Sule Pagoda and Chinatown, the construction will take place among bustling crowds of locals and tourists alike.
The commercial sea port of Yangon, which is located adjacent to the project site, adds on the challenge of having to safely redirect heavy vehicles away from closed off areas of construction.
Special Feature:
Approach bridge with longitudinal slope of 6% gradient. PC I-Grider lifting height up to 45m from ground level.
Project Description:
- Type: Cable-stayed Bridge
- Total bridge length: 1868m (577m Dala Approach; 601m Yangon Approach; 690m cable-stayed main bridge)
- Superstructure: Cable-stayed bridge with precast I girder approach bridge.
Construction Methodology:
Span by span method using launching gantry (approach bridge)