Logos Metrolink WH 1&2, Indonesia
Builder: CNQC – MTRA JO
Engineer: TTW Indonesia
Year of Completion: 2020
Involvement:
- Design, supply & installation of Post-Tensioning works
PT Floor Area:
125,000 m²
Floor System:
- PT beam & slab
Construction Methodology:
Application of large-scale PT flat slab system enabling efficient warehouse logistics, allowing ramp access and truck loading on elevated floors.
Special Feature:
First PT warehouse in Indonesia designed for 40 ft container trucks to directly access upper floors.