Logos Metrolink WH 1&2, Indonesia

Builder: CNQC – MTRA JO

Engineer: TTW Indonesia

Year of Completion: 2020

Involvement:
- Design, supply & installation of Post-Tensioning works

PT Floor Area: 
125,000 m²

Floor System:
- PT beam & slab

Construction Methodology:
Application of large-scale PT flat slab system enabling efficient warehouse logistics, allowing ramp access and truck loading on elevated floors.

Special Feature:
First PT warehouse in Indonesia designed for 40 ft container trucks to directly access upper floors.

Related Projects

FIND OUT MORE ABOUT US