Hup Hin Transport, Singapore

7-storey single user ramp-up warehouse

Builder: Precise Development Pte Ltd

Engineer: THYMN Pte Ltd

Year of Completion: 2019

Precast Works Description:
- T-slab volume: 8,632 m³
- U-shell area: 7,060 m²

PT Floor Area: 66,782 m²

Involvement:
- Design, supply & installation of Post-Tensioning works
- Supply & delivery of precast element (T-Slab & U-Shell)

Floor System: 
- Warehouse: 18m span beam (U-shell, post-tension) & 18m span slab (T-Slab, pre-tension)
- Driveway: 18m span beam & slab
- Ramp: 18m span beam & slab
- Office: 18m x 18m flat slab