Bishan Sky Habitat Condominium, Singapore

Sky bridge lifting  

Builder: Shimizu Corporation

Engineer: RSP Architects Planners & Engineers Pte Ltd

Year of Completion: 2014

Involvement:
- Design, supply & operating of lifting system
- Structural design assistance

Project Description:
- Install lifting system at level 38, then lift & install steel link bridge at level 14, 26 & 38
- The heaviest bridge is 275 tons, highest lifting point is 122m


Related Projects

FIND OUT MORE ABOUT US