Pure Data Centre, Indonesia
Builder: TATAMULIA
Engineer:
- TTW Indonesia
- RED Engineering
Year of Completion: 2021
PT Floor Area:
- 20,000 m²
Floor System:
- PT flat slab
Involvement:
- Design, Supply & Installation of Post-Tensioning works
Construction Methodology:
Application of PT flat slab system with wide column spacing to achieve load capacity of 1.5 T/m² and high flatness requirement