Jembatan Metropolitan Palembang, Indonesia

Erection of precast girders for the construction of Musi IV bridge

Bridge:
- Typical section: U-Girder
- Typical span= 37.8m

Construction Methodology:
Span by span method using launching gantry

Builder: PT Adhi Karya

Engineer: PT Wahana Mitra Amerta

Year of Completion: 2017

Involvement:
- Erection of Precast U-Girders (each weighing 140 tons)
- Supply of self-launching gantry with capacity of 150 tons & 45m spans
- Design, fabrication,installation, commissioning & operation of launching gantry
- Construction engineering consultation & solutions in the following scopes:
   • Sequencing of erection of precast girders
   • Construction method for girder erection above river
   • Delivery of girder via top side of piers