Hin Heup Bridge, Laos

 

Builder: The Zenitaka Corporation

Year of Completion: 2009

Involvement:
- Supply & installation of Post-Tensioning works
- Supply & installation of system formworks
- Bridge construction using incremental launching method

Special Feature:
- This bridge is a single 195m long structure made up of 19 concrete box girder segments concreted in 7.65m to 11.50m. The bridge deck measures 10.54m in width & 2.80m in height
- Launching works were carried out using a 32m long steel nose with 2 numbers of heavy duty hydraulic jacks with 480T pulling capacity each