Marina Bayfront Bridge, Singapore

Triple cell box girder vehicular viaduct

Special Feature:
8 nos of 301m long replaceable external tendons anchored at the abutment wall

Project Description: 
Longest span: 68m

Construction Methodology:
Balanced cantilever segmental construction

Builder: Sato Kogyo (S) Pte Ltd

Engineer: Arup Singapore Pte Ltd

Year of Completion: 2008

Involvement:
- Supply & installation of Post Tensioning works
- Design, supply & operating of form traveller
- Lifting & installation of precast T-shaped wing slab at the both sides